Product Owner / Project Manager skill for MVP/MMP/MMR implementation planning

  • Category: discovered
  • Tags: github, community
  • Version: 1.0.0
  • Author: walid
  • Downloads: 0
  • Updated: 2025-11-22

Download the latest version (v1.0.0) from this page.

SKILL.md

---
name: project-mgnt
description: Product Owner / Project Manager skill for MVP/MMP/MMR implementation planning
---

# project-mgnt

**Project Implementation Planning with MVP/MMP/MMR Methodology**

## Purpose

This skill teaches AI assistants how to analyze any project's requirements and create implementation plans using the MVP/MMP/MMR (Minimum Viable Product / Minimum Marketable Product / Minimum Marketable Release) methodology.

**This is a METHODOLOGY skill that teaches HOW to plan, not WHAT to plan.**

### Use Cases

1. **Initial Project Planning**: Analyze requirements and create structured implementation plan
2. **Plan Updates**: Modify existing plans when requirements change while preserving completed work
3. **Progress Tracking**: Update plans with current status and adjust remaining work
4. **Release Strategy**: Define logical stages and atomic groups for incremental delivery

### Adaptability

Works with:
- Any number of requirement documents (5 or 500)
- Different formats: BRD, PRD, User Stories, Epics, Features
- Various domains: Trading systems, web apps, APIs, infrastructure, ML/AI
- Changing requirements: Update plans without restarting completed work

### ID Naming Standards

**Reference**: `/opt/data/docs_flow_framework/ai_dev_flow/ID_NAMING_STANDARDS.md`

**Common ID Formats**:
- **Planning Documents**: `PLAN-NNN` (e.g., PLAN-001, PLAN-002)
- **Requirements**: `REQ-NNN` or `REQ-NNN-YY` (e.g., REQ-001, REQ-001-01)
- **Tasks**: `TASK-NNN` or `TASK-NNN-YY` (e.g., TASK-001, TASK-001-01)
- **Implementation Plans**: `IPLAN-NNN` (e.g., IPLAN-001)

**Format Rules**:
- Use TYPE-NNN for primary documents (three digits with leading zeros)
- Use TYPE-NNN-YY for sub-items (two digits with leading zeros)
- IDs are unique within their artifact type
- Sequential numbering starts at 001

---

## MVP/MMP/MMR Framework

### Definitions (2024-2025 Best Practices)

#### MVP (Minimum Viable Product)
**Purpose**: Learning vehicle to validate core hypothesis with early adopters
**Focus**: Test riskiest assumptions, gather feedback, prove feasibility
**Quality**: Can have bugs, imperfect UX, manual processes
**Goal**: Answer "Can we build this?" and "Will users use it?"
**Monetization**: Not required - learning, not earning
**Timeline**: 4-12 weeks typical

**MVP Success Criteria**:
- Core functionality works end-to-end
- Riskiest technical assumptions validated
- User feedback collected
- Product-market fit signals observed

#### MMP (Minimum Marketable Product)
**Purpose**: First release-ready product that delivers real customer value
**Focus**: Market-ready quality, essential features, can be sold/deployed
**Quality**: Polished UX, stable, production-ready, minimal bugs
**Goal**: Answer "Will customers pay for this?" and "Can we support it at scale?"
**Monetization**: Required - ready for paying customers
**Timeline**: 8-20 weeks after MVP

**MMP Success Criteria**:
- All essential features complete
- Production-quality code and UX
- Security, performance, reliability validated
- Support processes in place
- Marketing/sales materials ready

#### MMR (Minimum Marketable Release)
**Purpose**: Incremental feature releases that enhance market appeal post-MMP
**Focus**: Additional features, optimizations, integrations, scale improvements
**Quality**: Same as MMP - production-ready, market-quality
**Goal**: Answer "How do we grow adoption?" and "What drives retention?"
**Monetization**: Drives expansion revenue, reduces churn, attracts new segments
**Timeline**: 2-8 weeks per release (ongoing)

**MMR Success Criteria**:
- Adds measurable customer value
- Maintains product quality standards
- Fits within product roadmap vision
- Data-driven prioritization

### Progression Path

```
IDEA → MVP (validate) → MMP (launch) → MMR-1 → MMR-2 → MMR-n (grow)
         ↓                ↓              ↓        ↓        ↓
      Learn First     Earn First    Expand Value Stream
```

### Quality Gates

| Stage | Testing | Documentation | UX | Performance | Security |
|-------|---------|---------------|-----|-------------|----------|
| MVP | Manual OK | Minimal | Basic | Good enough | Basic |
| MMP | Automated | Complete | Polished | Production SLA | Full audit |
| MMR | Automated | Updated | Polished | Production SLA | Continuous |


---

## Analysis Methodology

Follow these 6 steps to create any implementation plan:

### Step 1: Requirements Discovery

**Objective**: Catalog all requirements and understand project scope

**Process**:
1. Read all requirement documents (BRD, PRD, user stories)
2. Extract for each requirement:
   - ID, Description, Complexity (1-5), Priority hints, Dependencies, Functional area
3. Create requirement inventory table

**Output**: Complete catalog of all requirements

### Step 2: Dependency Mapping

**Objective**: Identify relationships and sequencing constraints

**Dependency Types**:
- Technical: Requires infrastructure/library/component
- Business: Prerequisite functionality for workflow
- Data: Requires schema/migration/data source
- Integration: Depends on external system/API

**Process**:
1. For each requirement, identify dependencies
2. Classify as blocking or non-blocking
3. Create dependency graph
4. Identify critical path

**Output**: Dependency map showing blocking relationships

### Step 3: Atomic Grouping Principles

**Objective**: Create independently deployable, testable groups

**Atomic Group Characteristics**:
- Cohesive: Related functionality together
- Independent: Can be developed/tested/deployed separately
- Testable: Clear acceptance criteria
- Valuable: Delivers observable outcome
- Sized Right: 1-4 weeks of work

**Grouping Techniques**:
1. Functional Cohesion: Group by feature area
2. Technical Layer: Group by architectural component
3. User Journey: Group by end-to-end workflow
4. Dependency Cluster: Group tightly coupled requirements

**Naming Convention**: "[Component] [Action]" (e.g., "Broker Integration", "Risk Validation Framework")

**Output**: List of atomic groups with clear boundaries

### Step 4: Stage Assignment (MVP/MMP/MMR)

**Decision Framework**:

MVP Assignment Criteria (must meet at least 2):
- Validates core technical feasibility
- Required for end-to-end workflow
- Tests riskiest assumption
- Generates critical user feedback
- No viable workaround exists

MMP Assignment Criteria:
- Essential for first customer/user
- Required for production deployment
- Regulatory/compliance necessity
- Security/reliability/data integrity critical
- Competitive table stakes feature

MMR Assignment Criteria:
- Enhances existing functionality
- Expands market reach or use cases
- Optimization or performance improvement
- Integration with optional systems
- Nice-to-have that drives adoption/retention

**Output**: Each atomic group assigned to MVP, MMP, MMR-1, MMR-2, etc.

### Step 5: Priority Numbering

**Priority Numbering System**:
- Sequential priorities (1, 2, 3...): Must complete in order
- Parallel priorities (same number): Can execute simultaneously

**Prioritization Rules**:
1. Dependency-Driven: Higher priority = fewer dependencies
2. Risk-First: Address high-risk/uncertainty early
3. Value-Weighed: Balance technical dependencies with business value
4. Resource-Aware: Consider team size and skill distribution

**Parallelization Check**:
- No technical dependencies?
- Different code areas?
- Separate team members available?
- No shared infrastructure bottleneck?
- Integration points clearly defined?

If all yes → Assign same priority number

**Output**: Priority-numbered atomic groups

### Step 6: Timeline Estimation

**Complexity-Based Estimation**:
- Complexity 1: 0.5-1 week
- Complexity 2: 1-2 weeks
- Complexity 3: 2-3 weeks
- Complexity 4: 3-4 weeks
- Complexity 5: 4-6 weeks

**Buffer Management**:
- Stage level: +15% buffer
- Project level: +25% buffer

**Timeline Formula**:
```
Total Time = Σ(Group Duration) / Parallel Tracks + Stage Buffers
```

**Output**: Gantt chart with start/end dates and milestones

---

## Progress Tracking & Status Management

### Implementation Status Categories

| Status | Symbol | Meaning | Mutability |
|--------|--------|---------|------------|
| COMPLETED | ✅ | Fully implemented, tested, deployed | IMMUTABLE |
| IN_PROGRESS | 🚧 | Currently being worked on | Assess impact |
| BLOCKED | ⏸️ | Cannot proceed due to dependency/issue | Requires resolution |
| PLANNED | 📅 | Not yet started, future work | FREELY MODIFIABLE |
| MODIFIED | 🔄 | Changed from original plan | Document changes |
| CANCELLED | ❌ | Removed from scope | Justify removal |

### Status Tracking Requirements

1. Every atomic group MUST have a status
2. **Completed work is IMMUTABLE** - never modify in plan updates
3. In-progress work requires careful impact assessment
4. Only planned work can be freely rearranged
5. All status changes MUST be documented in change log


---

## Change Management Protocol

### Scenario A: New Project (Initial Plan Creation)

**When to Use**: Starting new project, no prior plan

**Inputs**:
- Complete set of requirement documents
- Project context (domain, team size, constraints)
- Timeline constraints (if any)

**Process**:
1. Execute Steps 1-6 (Requirements Discovery through Timeline Estimation)
2. All atomic groups marked as PLANNED
3. Timeline starts from project kickoff (Week 1)

**Output**: `PLAN-XXX_[project_name].md` version 1.0

---

### Scenario B: BRD Changes with Existing Plan (MOST CRITICAL)

**When to Use**: Requirements changed AND project underway

**Inputs**:
- Modified/new requirement documents
- Existing implementation plan
- **Current progress status** (which groups are complete/in-progress)
- Current date (timeline restart point)

**Process** (CRITICAL - Follow Exactly):

**Phase 1: Preserve Completed Work (IMMUTABLE)**
1. Identify all groups with status COMPLETED
2. Mark as LOCKED - do NOT modify
3. **Rule**: Never delete, rename, or change scope of completed work

**Phase 2: Assess In-Progress Work**
1. Identify groups with status IN_PROGRESS
2. Assess: Does BRD change affect scope? Should work continue?
3. Document assessment
4. Decision: Continue as-is / Adjust scope / Cancel

**Phase 3: Analyze BRD Changes**
1. Identify added/modified/removed requirements
2. Map changes to atomic groups
3. Determine affected groups and new groups needed

**Phase 4: Replan PLANNED Work Only**
1. Only modify groups with status PLANNED
2. Options: Regroup, Reprioritize, Add new, Cancel, Modify scope
3. Re-run dependency analysis
4. Re-run stage assignment

**Phase 5: Update Timeline**
1. **Start from current date**, NOT project start
2. Calculate remaining work
3. Re-estimate remaining groups
4. Update end date projection
5. Calculate timeline variance

**Phase 6: Document Changes**
1. Create detailed change log
2. Document BRD changes and rationale
3. List all affected groups
4. Explain timeline impact
5. Update progress summary

**Output**: Updated `PLAN-XXX_[project_name].md` (version incremented)

**CRITICAL RULES**:
- ✅ PRESERVE all completed work
- ✅ ASSESS impact on in-progress work
- ✅ ONLY modify planned work
- ✅ START timeline from TODAY
- ✅ DOCUMENT all changes
- ❌ NEVER modify completed groups
- ❌ NEVER restart timeline from Week 1

---

### Scenario C: Progress Update (No BRD Changes)

**When to Use**: Update plan with progress, requirements unchanged

**Inputs**:
- Existing plan
- Progress update (status changes)
- Current date

**Process**:
1. Update status of groups
2. Mark completed groups with dates
3. Update progress metrics
4. Adjust timeline if pace differs
5. Identify blocked items

**Output**: Refreshed `PLAN-XXX_[project_name].md`


---

## Execution Templates

### Template: Implementation Plan Document Structure

```markdown
# Implementation Plan: [Project Name]

## Document Control

| Item | Details |
|------|---------|
| **Project Name** | [Name] |
| **Plan ID** | PLAN-001 |
| **Version** | X.0 |
| **Date** | YYYY-MM-DD |
| **Status** | [Active / Completed / On Hold] |
| **Owner** | [Name] |
| **Preparer** | [Name] |

### Document Revision History

| Version | Date | Author | Changes Made | Approver |
|---------|------|--------|--------------|----------|
| 1.0 | YYYY-MM-DD | [Name] | Initial plan creation | |
| | | | | |

---

## Executive Summary

**Project Goal**: [One-sentence description]
**Implementation Approach**: MVP → MMP → MMR staged releases
**Current Status**: [X% complete, Y of Z groups done]
**Timeline**: Start: YYYY-MM-DD, Projected End: YYYY-MM-DD, Duration: X weeks

**Key Milestones**:
- MVP: [Date] - [Status]
- MMP: [Date] - [Status]
- MMR-1: [Date] - [Status]

---

## Implementation Progress Summary
*(Include in updated plans)*

**Overall Status**: X% Complete (Y of Z groups completed)

**Completed Stages**:
- MVP (Completed: YYYY-MM-DD, Duration: X weeks)

**Current Stage**: MMP Phase 2 (Week 3 of 4)

**Completed Groups**: [List with dates]
**In Progress**: [List with status]
**Planned**: [List with start dates]
**Blocked**: [List with issues]
**Modified**: [List with reasons]
**Cancelled**: [List with justification]

**Timeline Adjustment**:
- Original End: YYYY-MM-DD
- Current Projected: YYYY-MM-DD
- Variance: +/- X weeks
- Reason: [Explain]

---

## Stage 1: MVP (Minimum Viable Product)

**Goal**: [What this stage validates]
**Status**: [NOT_STARTED / IN_PROGRESS / COMPLETED]
**Duration**: [Original X weeks] | Actual: [If complete]

**Success Criteria**:
- [ ] [Criterion 1]
- [ ] [Criterion 2]

**Exit Criteria**:
- [ ] Core functionality works end-to-end
- [ ] Riskiest assumptions validated

### Atomic Groups

#### Priority 1: [Group Name]
**Status**: [COMPLETED / IN_PROGRESS / BLOCKED / PLANNED / MODIFIED / CANCELLED]

**Requirements**:
- REQ-001: [Description]
- REQ-002: [Description]

**Dependencies**:
- [Dependency 1] (Status: Satisfied / Pending)

**Deliverable**: [Clear, testable output]

**Success Criteria**:
- [ ] [Criterion]

**Duration**: X weeks
**Completion Date**: [If COMPLETED]
**Notes**: [If MODIFIED/BLOCKED/CANCELLED]

---

## Timeline Visualization

```mermaid
gantt
    title Implementation Timeline
    dateFormat YYYY-MM-DD
    section MVP
    Group 1 (✅)  :done, mvp1, 2024-01-01, 2w
    Group 2 (🚧)  :active, mvp2, 2024-01-15, 2w
    Group 3 (📅)  :mvp3, 2024-01-29, 1w
```

---

## Change Log
*(Required in updated plans)*

### Version 2.0 - YYYY-MM-DD

**Reason for Update**: [BRD changes / Progress update]

**BRD Changes**:
- BRD-004: Added 5 new requirements (REQ-041 to REQ-045)

**Impact Analysis**:
- Completed Work: Preserved as-is
- In-Progress Work: [Assessment]
- Planned Work: [Modifications]

**Specific Changes**:
1. Group X: MODIFIED - Added REQ-041, REQ-042
2. Group Y: NEW - Created for REQ-043, REQ-044, REQ-045
3. Group Z: CANCELLED - Requirement removed

**Timeline Impact**: +2 weeks due to new Group Y

---

## Traceability Matrix

| Atomic Group | Requirements | ADRs | BDD Scenarios | Status |
|--------------|--------------|------|---------------|--------|
| MVP Group 1 | REQ-001, REQ-002 | ADR-006 | broker.feature | ✅ |
| MMP Group 5 | REQ-041, REQ-042 | ADR-008 | risk.feature | 🚧 |
```


---

## AI Assistant Usage Instructions

### How to Invoke This Skill

#### Scenario 1: Create Initial Implementation Plan

**Command Pattern**:
```
"Use the project-mgnt skill to create an implementation plan for [project name].

Inputs:
- Requirement documents: [list file paths]
- Project context: [domain, team size, constraints]
- Timeline constraint: [if any]

Create PLAN-XXX_[project_name].md following MVP/MMP/MMR methodology."
```

**Example**:
```
"Use the project-mgnt skill to create an implementation plan for trading system.

Inputs:
- Requirements: {project_root}/docs/BRD/BRD-*.md (11 files)
- Context: Options trading, 5 FTE team, paper trading first
- Constraint: MVP in <3 months

Create PLAN-001_trading_system.md in docs/IMPL/"
```

---

#### Scenario 2: Update Existing Plan (Requirements Changed)

**Command Pattern**:
```
"Use the project-mgnt skill to update the implementation plan at [path].

Inputs:
- Modified BRDs: [list changed files]
- Existing plan: [path]
- Current progress: [which groups complete/in-progress]
- Current date: [today]

IMPORTANT: Preserve completed work, only modify planned work."
```

**Example**:
```
"Use the project-mgnt skill to update PLAN-001_trading_system.md.

Inputs:
- Modified: BRD-004 added 5 new risk requirements
- Plan: docs/IMPL/PLAN-001_trading_system.md v1.0
- Progress: MVP complete (Groups 1-4), Group 5 in progress (week 2/4)
- Date: 2024-02-01

Create v2.0 with change log."
```

---

### Expected Outputs

Every invocation MUST produce:

1. **Implementation Plan Document**
   - Filename: `PLAN-XXX_[project_name].md`
   - Location: User-specified or docs/IMPL/
   - Format: Markdown following template
   - Versioning: v1.0, v2.0, v3.0...

2. **Required Sections**
   - Document Control section with project metadata and revision history
   - Executive Summary
   - Progress Summary (if update)
   - Stage breakdown (MVP, MMP, MMR)
   - Atomic groups with priorities, status, dependencies
   - Timeline visualization (Gantt chart)
   - Success metrics and exit criteria
   - Change log (if update)
   - Traceability matrix

3. **Change Log** (updates only)
   - BRD changes documented
   - Impact analysis
   - Specific group changes
   - Timeline impact

---

## Decision Frameworks

### Framework 1: MVP Scope Decisions

**Question**: Should this feature be in MVP?

**Key Questions**:
1. Does it test the core hypothesis?
2. Can we validate without it?
3. Is there a simpler alternative for MVP?
4. Does it validate high-risk assumption?
5. Is there a viable workaround?

**MVP Inclusion Criteria** (meet at least 2):
- [ ] Validates core technical feasibility
- [ ] Required for end-to-end workflow
- [ ] Tests riskiest assumption
- [ ] Generates critical user feedback
- [ ] No viable workaround exists

---

### Framework 2: Parallel vs Sequential

**Decision Checklist**:

```
Group A + Group B can be parallel if:
- [ ] No code dependencies
- [ ] Different files/modules
- [ ] No shared database schema changes
- [ ] No shared infrastructure
- [ ] Separate team members available
- [ ] No specialized skill bottleneck
- [ ] Integration points clearly defined
- [ ] Low rework risk

If 8-10 checks = ✅ PARALLEL (same priority)
If 5-7 checks = ⚠️ PARALLEL with caution
If <5 checks = ❌ SEQUENTIAL
```

---

### Framework 3: Stage Gate Criteria

**MVP → MMP Gate**:

Exit Criteria (must meet ALL):
- [ ] Core functionality works end-to-end
- [ ] Riskiest assumptions validated
- [ ] User feedback collected
- [ ] Critical bugs logged
- [ ] Team consensus: hypothesis validated
- [ ] Product Owner sign-off

Proceed if:
- ✅ Hypothesis confirmed
- ✅ Technical feasibility proven
- ✅ Team confident

STOP if:
- ❌ Hypothesis rejected
- ❌ Technical infeasibility
- ❌ Cost exceeds value

---

### Framework 4: Update Impact Assessment

**Process**:

**Step 1: Categorize Change**
- Type: New / Modified / Removed / External dependency
- Size: Small (<5 req) / Medium (5-15) / Large (>15)
- Timing: Early (planned) / Mid (in-progress) / Late (completed)

**Step 2: Map to Groups**
- Completed groups: [Impact: None / Re-validation needed]
- In-progress groups: [Impact: Continue / Adjust / Stop]
- Planned groups: [Impact: Modify / Cancel / Reprioritize]

**Step 3: Impact Level**
- NONE: No action
- LOW: <1 week, adjust in place
- MEDIUM: 1-2 weeks, consider new group
- HIGH: >2 weeks, create new group
- CRITICAL: Invalidates group, cancel/redistribute

**Step 4: Decision Matrix**
- COMPLETED: No change (immutable) unless re-validation needed
- IN_PROGRESS: Continue / Adjust / Stop and replan
- PLANNED: Adjust / Modify / Cancel / Create new


---

## Adaptation Guidelines

### For Different Project Types

#### Infrastructure Projects
- **MVP**: Single environment (dev) with core infrastructure, automation scripts
- **MMP**: Production with full DR/HA, all IaC automated
-